Opens in a new tab

Grid Today

Grid Today
Natural Gas Proposals Test Illinois Grid Plans
Natural Gas Proposals now sit beside renewable and storage queues as Illinois tests capacity planning, reliability needs, and policy limits.

October 6, 2026

Grid Today
Grid-Interactive Technologies Tested in New York
New York field tests show how Grid-Interactive Technologies used building controls and AC batteries to manage peaks, with limits.

September 30, 2026

Grid Today
Advanced Grid Solutions For Transmission
Advanced Grid Solutions are being tested at INL to improve use of existing lines, with limits tied to data, controls, and utility adoption.

September 28, 2026

Grid Today
Duquesne Light grid modernization Reliability Review
Duquesne Light grid modernization links sensors, line ratings, and capital work to reliability, but outage data show mixed results.

September 24, 2026

Grid Today
Transmission Needs Study Guides Grid Planning
Transmission Needs Study findings clarify congestion, load growth, and planning limits for future U.S. grid infrastructure decisions.

September 22, 2026

Grid Today
Transmission Needs Study and Grid Capacity
The Transmission Needs Study points to congestion, load growth, and equipment shortages shaping U.S. grid planning through 2035.

September 20, 2026

Grid Today
Stormbreaker Testbed and Grid AI Resilience
Stormbreaker Testbed is now testing LLM and agentic AI behavior in power and OT settings, with focus on reliability limits.

September 18, 2026

Grid Today
Renewable Curtailment Forecasting for CAISO
Renewable curtailment forecasting is improving CAISO planning, but storage, load shifting, and transmission limits still shape grid stability.

September 7, 2026